Road viaducts T5 on the Arachthos - Peristeri section of Egnatia motorway
03-01_Gef.-T5_3.jpg

EGNATIA ODOS S.A., Final design, 2001, 6.490.000 €


Road viaducts carrying two independent branches of motorway with a total length of 240m each (34m + 4x43m + 34m = 240m), a maximum width of 17m and a maximum pier height of 22,5m. Continuous superstructures of prestressed concrete single-cell box girder with sloping sides, rigidly connected to the piers. Pile foundations. Superstructures constructed with the span by span method on conventional formwork.


The final design was carried out in 2001, with a design budget of 6.490.000€, project owner EGNATIA ODOS S.A., construction by JV TERNA S.A. - ATHENA S.A., completed in 2004.