Road underpasses of the Kozani - Ptolemaida National Road on the Aliakmon - Kozani section of Egnatia motorway
07-01_Komvos-Kozanis-X.U.-42837-1.jpg

EGNATIA ODOS S.A., Preliminary and final design, 1999, 3.015.000 €


Road bridges carrying two independent branches of the motorway with a total length of 100m (27,5m + 45m + 27,5m = 100m), a width of 14,7m each and a pier height of 6m. Continuous superstructures with two T-beams of varying width, rigidly connected to the piers and deck slab. Pile foundations.


The preliminary and final design were carried out in 1999, with a design budget of 3.015.000€, project owner EGNATIA ODOS S.A., construction by EFKLEIDIS S.A., completed in 2001.