Road underpass of the Ioannina - Arta National Road on the Pedini - Platania section of Egnatia motorway
08-01Gef.-2_1.jpg

JV AKTOR S.A. - THEMELIODOMI S.A. - PANTECHNIKI S.A., Final design, 2002, 1.770.000 €


Road bridges carrying two independent branches of the motorway with a total length of 80m (22m + 36m + 22m = 80m), a width of 12,75m each and a pier height of 9m. Continuous superstructures of concrete voided slab with slopping sides, rigidly connected to the piers. Pile foundations.


The final design was carried out in 2002, with a design budget of 1.770.000€, project owner EGNATIA ODOS S.A., construction by JV TEV S.A. - THEMELIODOMI S.A. - PANTECHNIKI S.A., completed in 2003.