EGNATIA ODOS S.A., Final design, 2007, 2.574.000 €


Road bridge carrying the right branch of the motorway, with a total length of 170,0m

(2x85,0m = 170,0m), a width of 13,7m and a pier height of 16,1m. Continuous superstructure of prestressed concrete single-cell box girder of variable depth, rigidly connected to the pier, constructed with the balanced cantilever method. Bridge pier is founded on cylindrical shaft.
The final design was carried out in 2007, with a design budget of 2.574.000€. Project owner EGNATIA ODOS S.A., construction by AKTOR S.A., completed in 2009.