Monastiriou Street flyover crossing the railway lines at “Mytilinakia”, Thessaloniki
16_Monast_1.jpg

V A. DIMITRAKOPOULOS TECHNIKA ERGA S.A. - THEMELIODOMI S.A., Preliminary and final design, 1981, 780.000 €


Road bridge with a total length of 250m (5x22,5m + 30,5m + 24m + 15,5m + 3x22,5m = 250m), a width of 17m and a maximum pier height of 7,2m. Superstructure consisting of simply supported prestressed concrete voided slabs on elastomeric bearings. Pile foundations.


The preliminary and final design were completed in 1981, with a design budget of 780.000€, project owner Ministry of the Environment, Planning and Public Works, construction following tender by JV A. DIMITRAKOPOULOS TECHNIKA ERGA S.A., - THEMELIODOMI S.A., completed in 1984.