Local Road overpass on the Pedini - Platania section of Egnatia motorway
05-01_Gef.-15464_2.jpg

JV AKTOR S.A. - THEMELIODOMI S.A. - PANTECHNIKI S.A., Final design, 2002, 730.000 €


Road bridge with a total length of 71,2m (19,6m + 32m + 19,6m = 71,2m), a width of 11m and a pier height of 8,5m. Continuous superstructure consisting of a concrete voided slab with slopping sides, rigidly connected to the piers. Pile foundations.


The final design was carried out in 2002, with a design budget of 730.000€, project owner EGNATIA ODOS S.A., construction by JV TEV S.A. - THEMELIODOMI S.A. - PANTECHNIKI S.A., completed in 2003.