Cut & Cover tunnel in the Konstantinoupolitika area of Thessaloniki inner ring road
CutCover-04.jpg

YPECHODE, Prestudy and Final design, 1991, 1.895.000 €


Cut & Cover tunnel, length of 140,0m and width of 2x12,0m=24,0m. Arch cast in place reinforced concrete cover slab rigidly connected to series of cast in place bored piles.
The prestudy and final design were carried out in 1991, with a design budget of 1.895.000 €. Project owner YPECHODE (Ministry of the Environment, Physical Planning and Public Works), construction by THESSALIKI S.A., completed in 1991.