News






















Project Coordinator : MARIA DEDA
Consultants :
International Architects: MKV Design,
Project Management: FOCAL
Contractor: RED EX
Local Architects : METE SYSM S.A.
Civil Engineers: METE SYSM S.A.
M&E Engineers: V. Konstantinides
Lighting Designers: ELEFTHERIA DEKO & Associates
Acoustic Consultant: Acoustical Engineering





Description: Design of two multi-span semi-integral bridges of
complex geometry with overall lengths 550 and 270 m.
Superstructures consist of prestressed concrete voided slabs
rigidly connected to the piers. Bridge foundations on pile caps
and 43 to 50 m long bored piles. The bridges are under
construction.
Design period: 2008 - 2009
Client: Region of Central Macedonia - Directorate of Public
Works
Total construction cost (€ mil): 11,5
Services by METE SYSM: Detailed bridge design, preparation
of tender documents, construction follow-up.











DESIGN TEAM : METE SYSM S.A, Maria Deda
Architects :
METE SYSM S.A.:
Konstantinos Lefakis
Ifigenia Douka
Αlexia Prassa
Giorgos Hatzikosmas
Manos Tourpalis
Varvara karaoglou
Korina Voulgaridou
Christina Brozou
Maria Deda
Structural Engineer Consultant
METE SYSM S.A. :
Nikos Nanousis
E/M Installations Consultant
Vassilis Konstantinidis







A small commercial shopping mall in "Dream city" of Erbil in Iraq, consisting of ground floor, 2 high-rise floors with mezzanines and one basement level.
The main elevation is cladded with white semi-trans parent stone material and shaded with horizontal louvres surrounding a multi-level urban plaza articulated as a relaxing park and as cafe's and restaurant's sitting area.















Shopping Mall, Residences and Offices, Erbil, Iraq












Shopping Center and Hotel Apartments, Saudi Arabia




























































Design Team :
Architectural Study : METE SYSM S.A.
Konstantinos Lefakis
Korina Voulgaridou
Alexia Prassa
Eleni Chalati
Alexia Filippou
Christina Brozou
Electromechanical Study :
Olga Konstantinidou
Planning, Design and Management of Environmental and Construction : OMIKRON LTD
Anastasios Malamis
Apostolia Papadoudi
Athanisios Topaloudis






DESIGN TEAM : Maria Deda & Associates
Architects :
Maria Deda
METE SYSM S.A.:
Konstantinos Lefakis
Ifigenia Douka
Varvara karaoglou
Alexia Filippou
Korina Voulgaridou
Αlexia Prassa
Structural Engineer Consultant
METE SYSM S.A. :
Nikos Nanousis
E/M Installations Consultant
J.E.P.A. :
John Papagrigorakis











METE SYSM will participate in Beijing Design Week.
The project to be presended concerns the design of an Exhibition Stand for the "ENERGIERS" Company.
The exhibition stand has been designed in 2012.










After the completion of the judgment procedure, the competition's results were announced. METE SYSM proposal won the 3rd prize.
Architects: METE SYSM S.A.
Konstantinos Lefakis
Varvara Karaoglou
Alexia Prassa
Manos Tourpalis
Giorgos Karakostas
Alexia Filippou
Korina Voulgaridou
Christodoulos Antoniadis